Operator Checklist Pack (Printable)
This is the truck-ready pack. (DOCX/PDF downloads can be wired here next.)
Operator Checklist Pack v1 (Printable)
Print this and keep it in the truck.
Additional printables:
03_curriculum/printables/safety-loadout-checklist-v1.md03_curriculum/printables/spill-and-exposure-response-card-v1.md
Roof Soft Wash — QA Checklist
Before you start
- Roof type confirmed (shingle/tile/metal)
- Scope confirmed (roof only vs bundles)
- Pre-existing damage documented (photos)
- Wind direction checked
- Plant protection started (pre-wet)
- Dedicated rinse line staged
During
- Work in sections (controlled coverage)
- Plants rinsed throughout
- Overspray monitored (windows/paint/screens)
Rinse / finish
- Rinse complete (low pressure)
- Gutters/downspouts rinsed
- Final plant rinse
- Walkways not slick
Proof Pack
- Before/after angles matched
- Close-up wins captured
- Exceptions documented
- Proof Pack link stored in CRM/job board
Customer closeout
- Completion message sent
- Expectations set (if any slow-release improvement)
House Wash — QA Checklist
Before
- Scope confirmed (walls/soffits/trim)
- Oxidation vs organic diagnosed
- Pre-existing conditions photographed
- Plants pre-wet
- Wind checked
- Dedicated rinse line staged
During
- Top-down workflow
- Even application (no striping)
- Avoid vents/soffit gaps/failing seals
- Plants rinsed during dwell
Rinse / finish
- Thorough rinse
- Windows/doors/fixtures checked for residue
- Final plant rinse
Proof Pack
- Before/after angles matched
- Exceptions documented (oxidation, hard water, rust)
- Proof Pack link logged
Customer closeout
- Completion message sent
- Expectations set for anything outside scope
Flatwork — QA Checklist
Before
- Substrate identified (concrete/pavers/coated/stone)
- Pre-existing damage photographed
- Runoff plan set
- Plants pre-wet
During
- Consistent overlap passes
- Steady walking speed
- No lingering in one spot
- Edges handled carefully
Finish
- Wide-angle check for striping
- Edges clean
- No overspray on walls/doors
Proof Pack
- Before/after consistent angles
- Notes on permanent stains
- Link logged
Final Walk Checklist (Universal)
1) Safety + site
- Hoses, tools, ladders cleared
- Walkways not slick
- Gates closed (if applicable)
2) Landscaping
- Final rinse completed
- No concentrated runoff damage zones
3) Glass + fixtures
- Glass check: no residue/spotting
- Fixtures check: no residue on lights/cameras/door hardware
4) Runoff
- No dirty runoff pushed into beds
- Edges/transitions rinsed
5) Proof Pack
- Before/after angles matched
- Exceptions documented
- Proof Pack link uploaded and logged
6) Customer closeout
- Completion message sent
- Expectations set (if any limitations)
- Review ask scheduled (24–72 hours)
Proof Pack — Minimum Shot List
Universal (all jobs)
- Context shot (house number / identifiable context). Avoid people + plates.
- Wide BEFORE (full area)
- 2–6 close-up BEFORE shots (problem areas)
- Wide AFTER (same framing)
- Close-up AFTER (match each close-up)
- Final “jobsite clean” shot (hoses coiled, area tidy)
Roof add-ons
- Multiple roof planes + valleys
- “Worst side” (often shaded/north)
- Drip edge/gutter line
Windows add-ons
- Exterior reflection check (2 angles)
- Frames/sills/tracks (if included)
Gutters / brightening add-ons
- Tiger stripe close-up before/after
- Downspout discharge (if relevant)
Flatwork add-ons
- Wide “striping-free” after
- Edges/transitions