Roof Soft Wash — QA Checklist

Before you start

  • Roof type confirmed (shingle/tile/metal)
  • Scope confirmed (roof only vs bundles)
  • Pre-existing damage documented (photos)
  • Wind direction checked
  • Plant protection started (pre-wet)
  • Dedicated rinse line staged

During

  • Work in sections (controlled coverage)
  • Plants rinsed throughout
  • Overspray monitored (windows/paint/screens)

Rinse / finish

  • Rinse complete (low pressure)
  • Gutters/downspouts rinsed
  • Final plant rinse
  • Walkways not slick

Proof Pack

  • Before/after angles matched
  • Close-up wins captured
  • Exceptions documented
  • Proof Pack link stored in CRM/job board

Customer closeout

  • Completion message sent
  • Expectations set (if any slow-release improvement)

House Wash — QA Checklist

Before

  • Scope confirmed (walls/soffits/trim)
  • Oxidation vs organic diagnosed
  • Pre-existing conditions photographed
  • Plants pre-wet
  • Wind checked
  • Dedicated rinse line staged

During

  • Top-down workflow
  • Even application (no striping)
  • Avoid vents/soffit gaps/failing seals
  • Plants rinsed during dwell

Rinse / finish

  • Thorough rinse
  • Windows/doors/fixtures checked for residue
  • Final plant rinse

Proof Pack

  • Before/after angles matched
  • Exceptions documented (oxidation, hard water, rust)
  • Proof Pack link logged

Customer closeout

  • Completion message sent
  • Expectations set for anything outside scope

Flatwork — QA Checklist

Before

  • Substrate identified (concrete/pavers/coated/stone)
  • Pre-existing damage photographed
  • Runoff plan set
  • Plants pre-wet

During

  • Consistent overlap passes
  • Steady walking speed
  • No lingering in one spot
  • Edges handled carefully

Finish

  • Wide-angle check for striping
  • Edges clean
  • No overspray on walls/doors

Proof Pack

  • Before/after consistent angles
  • Notes on permanent stains
  • Link logged

Final Walk Checklist (Universal)

1) Safety + site

  • Hoses, tools, ladders cleared
  • Walkways not slick
  • Gates closed (if applicable)

2) Landscaping

  • Final rinse completed
  • No concentrated runoff damage zones

3) Glass + fixtures

  • Glass check: no residue/spotting
  • Fixtures check: no residue on lights/cameras/door hardware

4) Runoff

  • No dirty runoff pushed into beds
  • Edges/transitions rinsed

5) Proof Pack

  • Before/after angles matched
  • Exceptions documented
  • Proof Pack link uploaded and logged

6) Customer closeout

  • Completion message sent
  • Expectations set (if any limitations)
  • Review ask scheduled (24–72 hours)

Proof Pack — Minimum Shot List

Universal (all jobs)

  1. Context shot (house number / identifiable context). Avoid people + plates.
  2. Wide BEFORE (full area)
  3. 2–6 close-up BEFORE shots (problem areas)
  4. Wide AFTER (same framing)
  5. Close-up AFTER (match each close-up)
  6. Final “jobsite clean” shot (hoses coiled, area tidy)

Roof add-ons

  • Multiple roof planes + valleys
  • “Worst side” (often shaded/north)
  • Drip edge/gutter line

Windows add-ons

  • Exterior reflection check (2 angles)
  • Frames/sills/tracks (if included)

Gutters / brightening add-ons

  • Tiger stripe close-up before/after
  • Downspout discharge (if relevant)

Flatwork add-ons

  • Wide “striping-free” after
  • Edges/transitions