Springboard • week-2-traditional-windows
Week 2 — Traditional Windows: Workflow + QA (Lesson)
← Prev

Week 2 — Traditional Windows: Workflow + QA (Lesson)

The workflow

  1. Confirm scope (inside/out, screens, tracks)
  2. Protect interiors (drop cloths)
  3. Dry prep frames/sills
  4. Wash + squeegee
  5. Edge detail
  6. Drip check
  7. Add-ons (screens/tracks) if sold

QA checks

  • sunlight streak check
  • no drips on sills/floors
  • customer walk-by approval if present

Proof Pack

Privacy-safe shots only.

Follow: 04_sops/proof-pack/proof-pack-sop-v1.md

Do this next (assignment)

  • Run this lesson on a real job or a mock walkaround.
  • Capture a Proof Pack for the scenario.
  • Do the Final Walk.

References (SOPs + checklists)

  • Proof Pack SOP: 04_sops/proof-pack/proof-pack-sop-v1.md
  • Final Walk checklist: 04_sops/universal/final-walk-checklist-v1.md

Printables

  • Operator Checklist Pack (truck copy): 03_curriculum/printables/operator-checklist-pack-v1.md

Gear Box (Amazon)

Gear Box links (Amazon): Coming soon.

Disclosure: As an Amazon Associate, we earn from qualifying purchases.