Springboard • week-2-traditional-windows
Week 2 — Traditional Windows: Workflow + QA (Lesson)
Week 2 — Traditional Windows: Workflow + QA (Lesson)
The workflow
- Confirm scope (inside/out, screens, tracks)
- Protect interiors (drop cloths)
- Dry prep frames/sills
- Wash + squeegee
- Edge detail
- Drip check
- Add-ons (screens/tracks) if sold
QA checks
- sunlight streak check
- no drips on sills/floors
- customer walk-by approval if present
Proof Pack
Privacy-safe shots only.
Follow: 04_sops/proof-pack/proof-pack-sop-v1.md
Do this next (assignment)
- Run this lesson on a real job or a mock walkaround.
- Capture a Proof Pack for the scenario.
- Do the Final Walk.
References (SOPs + checklists)
- Proof Pack SOP: 04_sops/proof-pack/proof-pack-sop-v1.md
- Final Walk checklist: 04_sops/universal/final-walk-checklist-v1.md
Printables
- Operator Checklist Pack (truck copy): 03_curriculum/printables/operator-checklist-pack-v1.md
Gear Box (Amazon)
Gear Box links (Amazon): Coming soon.
Disclosure: As an Amazon Associate, we earn from qualifying purchases.