Springboard • week-3-wfp-rodi
Week 3 — RO/DI Build + Maintenance (Lesson)
Week 3 — RO/DI Build + Maintenance (Lesson)
Build outcome
A leak-free RO/DI system with a known flow path and a known TDS output.
Build SOP
Maintenance habits
- check TDS before jobs
- service carbon/membrane/resin based on performance
- store out of sun; protect from freezing
Gear Box (Amazon)
Use Option A links only; otherwise placeholders.
Disclosure: As an Amazon Associate, we earn from qualifying purchases.
Do this next (assignment)
- Run this lesson on a real job or a mock walkaround.
- Capture a Proof Pack for the scenario.
- Do the Final Walk.
References (SOPs + checklists)
- Proof Pack SOP:
- Final Walk checklist:
Printables
- Operator Checklist Pack (truck copy):
Gear Box (Amazon)
(Insert the relevant Gear Box module for this lesson here.)
Disclosure: As an Amazon Associate, we earn from qualifying purchases.