Springboard • week-3-wfp-rodi
Week 3 — RO/DI Build + Maintenance (Lesson)
← Prev

Week 3 — RO/DI Build + Maintenance (Lesson)

Build outcome

A leak-free RO/DI system with a known flow path and a known TDS output.

Build SOP

Maintenance habits

  • check TDS before jobs
  • service carbon/membrane/resin based on performance
  • store out of sun; protect from freezing

Do this next (assignment)

  • Run this lesson on a real job or a mock walkaround.
  • Capture a Proof Pack for the scenario.
  • Do the Final Walk.

References (SOPs + checklists)

  • Proof Pack SOP: 04_sops/proof-pack/proof-pack-sop-v1.md
  • Final Walk checklist: 04_sops/universal/final-walk-checklist-v1.md

Printables

  • Operator Checklist Pack (truck copy): 03_curriculum/printables/operator-checklist-pack-v1.md

Gear Box (Amazon)

Gear Box links (Amazon): Coming soon.

Disclosure: As an Amazon Associate, we earn from qualifying purchases.