Core • Module 9 — Sales, estimating, and customer experience
Module 9 — Sales: The Trust Sandwich Estimate (Lesson)
Module 9 — Sales: The Trust Sandwich Estimate (Lesson)
What sells at top 50–75% pricing
Not hype.
Not “best price.”
It’s:
- clarity
- proof
- process
The Trust Sandwich (structure)
Top layer: what we reviewed + what “done” looks like.
Middle: treatment plan + what’s included / not included.
Bottom layer: scheduling + expectations + proof.
Use the template
Proof layer
Attach or link:
- plant protection protocol
- proof pack example
- insurance/proof docs (if requested)
Terms
Do this next (assignment)
- Run this lesson on a real job or a mock walkaround.
- Capture a Proof Pack for the scenario.
- Do the Final Walk.
References (SOPs + checklists)
- Proof Pack SOP: 04_sops/proof-pack/proof-pack-sop-v1.md
- Final Walk checklist: 04_sops/universal/final-walk-checklist-v1.md
Printables
- Operator Checklist Pack (truck copy): 03_curriculum/printables/operator-checklist-pack-v1.md
Gear Box (Amazon)
Gear Box links (Amazon): Coming soon.
Disclosure: As an Amazon Associate, we earn from qualifying purchases.